QEC/Geotechnical Engineering Department provides supports to structure designer through collection of requested soil parameters for structure -soil interaction and foundation design. Also, this department has ability to use different geotechnical software in design of foundations and solving soil problems. The soil data provided by geotechnical has great and important effect in finite element analysis of structures interact with soil.

Chief of Geotechnical Department: Siyamand T. Peerdawood

Consultant geotechnical Engineer /M.Sc Soil and Foundation

Email: geosiyamand@gmail.com  or siyamand.taher@qalaec.com

WHAT WE CAN DO

Consultancy and solution in different Soil Mechanics problems. Pile foundation design/check/redesign supported by software.

Foundation design/check/redesign supported by software programs. Structure retaining system design/ check supported by software programs. Supervision and evaluation of Pile Load Test for large projects.

Training courses in shallow and Pile foundation design, retaining structures. Plate load test for soil in field.

Preparation soil investigation reports. Engineering treatments for foundation problems. Earth Dam design.

 

    • Slope stability problems supported by software

    • Soil Investigation and soil report for large projects

.

GEOTECHNICAL PROJECTS

 

    1. Soil Investigation: Kempeniski hotel Shahan City

Hewa city Banol hotel

Darin Steel Factory Rasan city Shaqlawa view Kingstone Towers Med Steel Factory New Life Tower

F.G.F towers Golden City.

2- Plate load test:

Linac Hospital Project Fuel Tank-Makhmor

US NCC PROJECT Building

3- Pile load est:

Var project

Kirkuk-Erbil intersection road Kempeniski hotel

4- Redesign pile foundation:

Cihan City Project Var Park Project

5- Design secant pile wall for deep excavation:

Kempeniski Hotel project Brayati Towers project Nawroz Tower

6- Check design of retaining wall:

Lalav Pavilion project

7-Training course in ETAB and SAFE software.

8- Checking the pile foundation design of Grand towers project.

9- Design and supervising Pile foundation of Erbil Citadel new gate.

10- Design of earth dam for water storage.

Fuel Tank Makhmor/Erbil

US NCC PROJECT

Building – Erbil

F.G.F Towers Erbil

 

Kempinski Hotel

Secant Pile Wall

 

Pile secant wall

Kempinski Hotel Erbil

 

 

Kempinski Hotel Erbil

 

 

 

Kingstone Tower Erbil

 

 

 

Kingstone Tower Erbil

 

 

 

Dynamic pile test/ Kempinski Hotel

Erbil

 

 

 

Soil Investigation for kempinski Hotel

Erbil

 

 

 

Pile Load Test Var Park

Erbil

 

 

 

 

 

 

 

 

 

 

 

 

 


Soil Investigation, Soil Report in Pavillion b RAMS, Water Tank Project